Masaganang Agrikultura, Maunlad na Ekonomiya!

NP-036-19: Van Rental for the Participants of Entrepreneurial Development Training 3rd Batch on 9-13 September in Laguna (SAAD)

Author: DA-BAC | 22 April 2019

April 22, 2019

REQUEST FOR QUOTATION

No. NP-036-19

  1. MANDATORY REQUIREMENTS
  2. Submission of documentary requirements with mark “ü” as follows:

ü Mayor’s /Business Permit [1]

Professional License / Curriculum Vitae (Consulting Services)

ü Valid PhilGEPS Registration Number

PCAB License  (Infrastructure Projects)

Income Tax/ Business Tax Return (For ABCs above Php 500,000.00)

ü Omnibus Sworn Statement (For ABCs above Php 50,000.00)[2]

Performance Security for Infrastructure Projects

Warranty Security (For Goods or Infrastructure Projects)

 

  1. The Bidders/Suppliers or their Authorized Representative shall accomplish this form including unit price and total price as well as sub-total and grand total (if applicable) and affix their signature over printed name indicated in the lower portion of this form.
  2. Please write legibly.

 

  1. INSTRUCTIONS:
  2. Open quotations may be submitted at the address indicated below. In case of sealed quotation, the Bidders/Suppliers or their Authorized Representative shall indicate on the envelope the RFQ Number and the name of bidder/supplier. Otherwise, the quotation shall be rejected.
  3. Any interlineations, erasures, or overwriting shall be valid only if they are signed or initialed by the Bidders/Suppliers or their Authorized Representative.
  4. Quotation/s must include all kinds of taxes for the item(s)/services listed hereunder, including delivery charges.
  5. Price quotation(s) submitted shall be valid for a period of ONE HUNDRED TWENTY (120) days reckoned from the deadline for submission of quotations as reflected in this form.
  6. Terms of Payment – Thirty (30) days from delivery of item/s.
  7. Quotation(s)/Proposal(s) shall be submitted at the Office of the Procurement Division, 2nd Floor, ICTS Building, Department of Agriculture – Central Office, Elliptical Road, Diliman, Quezon City.
  8. Awarding shall be done by
  9. DEADLINE FOR SUBMISSION OF BIDS: April 25, 2019 at 12:00 noon
  10. In case of two or more bidders are determined to have submitted the Lowest Calculated Quotation/Lowest Calculated and Responsive Quotation or Highest Rated and Responsive Quotation for consultancy services, the DA-BAC shall employ “draw lots” as the tie-breaking method to finally determine the single winning provider in accordance with GPPB Circular 06-2005.
  11. Delivery and/or Installation Period: on the date of the activity.
  12. The Uniform Guidelines for Blacklisting set forth in Appendix 17 of the 2016 Revised IRR of RA 9184 shall apply in case any of the violations listed under Items 4.1 and 4.2 thereof is/are committed without prejudice for forfeiture of performance security.
  13. The Department of Agriculture reserves the right to reject any and all bids, declare a failure of bidding, or not award the contract at any time prior to contract award in accordance with Section 41 of RA 9184 and its IRR, without thereby incurring any liability to the affected bidder(s).

 

 

PRAS No. 19-0816                                    ABC: PhP55,000.00                                            End-User: SAAD                                                                             

 Mode of Procurement: Small Value Procurement (SVP)

Qty. Unit ITEM/DESCRIPTION CEILING FOR BID PRICES BID PRICE PER ITEM TOTAL BID PRICE
    Van rental for the participants of Entrepreneurial Development Training 3rd Batch on 9-13 September in Laguna      
 

 

 

4

 

 

 

unit

Itinerary:

-Pick-up at Department of Agriculture Gate 2 at 9:00 A.M. and drop to Laguna on September 9, 2019

-Pick up at Laguna and drop to Department of Agriculture Gate 2 on September 13, 2019

Van rental inclusion: toll fee, gasoline, driver, seating capacity of van at least 12 seater

 

 

 

PhP55,000.00

 

 

   
    TOTAL: PhP55,000.00    

 

 

ATTY. MICHAEL S. ANDAYOG

Chairperson, BAC Secretariat

 

 DA Bids and Awards Committee (BAC)

Elliptical Road, Diliman, Quezon City

 

SIR/MADAM:

 

            In connection with the above requirement(s), I/We submit our quotation/proposal indicated above. I/We carefully read and fully understand the minimum requirements and agree to furnish and/or deliver the above mentioned requirement(s) in conformity with the specifications/terms or reference/scope of work indicated/attached thereto.

 

________________________

Signature Over Printed Name

 

_________________________

Name of the Bidder

 

 

_________________________

PhilGEPS Registration Number

 

 

_________________________

Contact Number(s)

________________________

Office Address

 

_________________________

Email Address of the Bidder (Optional)

 

Terms of Payment: 

Payment shall be made through Land Bank’s LDDAP-ADA/Bank Transfer, Bank Transfer fee shall be charged against the creditor’s account.

 

Payment Details:

 

Banking Institution: __________________________________________

 

Account Number:  ___________________________________________

 

Account Name:  _____________________________________________

 

Branch:  __________________________________________________

                                                                         

 

 

 

 

[1]  In lieu of the Mayor’s Permit, only the BIR Certificate shall be submitted by the individual supplier/contractor/ service provider

[2] Note  The submission of Omnibus Sworn Statement shall be required from the winning bidder prior to payment.

*** PhilGEPS Certificate of Platinum Membership may be submitted in lieu of Mayor’s Permit and PhilGEPS Registration Number.

 

Please see attached link the signed Request for Quotation and Omnibus Sworn Statement

 

 

 

Back to Archives